Kitchen Reno

 The bulk of the major work is focused on the kitchen.  We needed to rework windows (removing 2, relocating 2 others) in order to create a better layout for cabinets and appliances.

Original layout of kitchen (lower) windows/door:


Reworked to remove door and two windows:

We added a knee wall to attach cabinets  (will be a U-shape with peninsula layout)

Wider view of layout with knee wall:

Drywall is finally going up after inspections:


Floors in kitchen are very out of level - they dip by almost 1 1/2" from one end to other.  In some cases we can shim floor, but base cabinets will have to be cut (on bottom)  and leveled.