Mo Floor

Time to refinish a floor.

Drum sander to strip most of finish and stain.


Followed by edge sander to cleanup border.


Reapply stain color


And first coat of polyurethane.




Prepping to refinish the last floor.

We need to refinish floor in master bedroom so first step is removing rest of furniture (And storing in closet).


Mostly empty, a few last items to pitch.


BTW, we also made the face frame for closet drawers.



Starting to sand floor edges.





Chest of Drawers?

When we removed the wall to create walk-in closet, we had a narrow but tall and deep, awkward space left due to the HVAC and plumbing lines running thru the bedroom up to the attic.

We had debated just using that space for tall hanging items, but decided to make a built-in unit with some extra deep (32") drawers, and open shelves on top.

Glue up side supports.


Get super long (32") drawer slides to mount inside.

Mount side supports in closet, screw to floor and walls for support.

Ordered some made-to-size drawers online.  


Mount all four with slides and voila.  Instant storage. We still have to make face frame and drawer fronts, as well as shelving above.



Closet, closet, closet

We were set to buy a closet system from an online vendor, and costs were about $4000 - but that was unfinished so we could match paint.  If they paint (their colors) it's almost $5000.  Given that most of closet will be hanging (no drawers and only one set of shelving), we priced out building it and it's under $1000.  Guess which option we chose?

Time to build. We previously shared pictures of lots of cut plywood.

First we glue edge on front of shelves - for decor and function.


Then we sand to ensure the new edge and plywood are 100% smooth - we're using this for clothes storage, don't want rough edges.


Repeat the above 5 times.  

Build some vertical spacers for the shelves and glue them up.


Attach vertical spacers to sides of shelving with glue and small finish nails.


Unfortunately the above step needs to be repeated - we have 6 spacers on each side, and we only have enough clamps to secure two at a time.  So lots of time waiting (4 hours) for glue to dry before we repeat the above.


Closet and Basement, cont

Continued to work on basement organization whilst trying to make progress on closet storage system.

More storage organization.


Storage for squares.


Installed light above sanding area, as well as hose loop and old yoga mat for sanding protection.


Replaced knives in planer (not pictured) and had super clean cuts planing trim pieces.  Starting to accumulate some wood...


Lots of off cuts and basement cleanup produces trash.




Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...