Goodbye Ceiling

As mentioned we have crappy insulation in the 2nd floot bathroom and none in the (short) adjacent hallway.  So this weekend we removed more ceiling and any debris to prep for insulation (later).

This is the ceiling section we're removing:



After some quick cuts, the ceiling panel fell down very easily in a solid section (until it hit the floor).  Note the complete lack of insulation - that's the roof sheathing you're looking at:


There was some debris that fell down. And a dead squirrel. And three dead birds. I'll save you from those pictures.


And we're adding a ceiling light in this short hallway because it's dark, so I ran a new electrical box for switch.



2nd Bathroom, take 2

One of the few benefits of delaying work on spaces is that a house reveals itself to you.  And after going thru winter snow we discovered the 2nd floor bathroom insulation was poor, leading to lots of snow melt:


So we need to remove the 2nd bathroom ceiling and take the opportunity to insulate properly (with spray foam) and seal it well.  Yes, we have to remove a perfectly good ceiling:


Hello poor/gapped insulation:

And after some cleanup and removal of old plaster:


Already took delivery of spray foam insulation, so when it's a touch warmer we'll remove all the old insulation batts and spray the entire ceiling.

We've also been working on more walls in bedroom.  Paint is almost done, working on trim and chair rail next.






Slow Progress

We've been making slow progress but keep moving forward.

Made a cork/magnet board for pantry:



Got some more tile in 2nd bathroom shower set (preparing to hang shower door)

The gap  in the tile is where the door mount will be attached:









Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...