Day 2 Projects
Day 1 Projects
We have to unpack, but the house still has a litany of projects.
Quickly finished plumbing for washing machine.
Moving Day
Moving day finally arrived. And it was mayhem.
Packing
Asphalt (And more)
Asphalt - we finally have a driveway. Not much to say other than the layout and pitch look great, we'll see when snow arrives...
Final grading:
Paving took most all day, but Catherine came over to install door pulls in kitchen
And we went back after dinner to sand, clean and stain the living room:
Kitchen Floors
And finally finishing the kitchen floors. Some sanding and staining to start
And then applying finish. First coat:
Bathroom 1
The first bathroom is nearly complete. We got the tile finished and grouted, and all fixtures installed.
Floor Progress
We made lots of progress and nearly finished Christian's bedroom. All walls are painted and the floor has been refinished.
The hallway has also be stained and refinished (ignore the dusty footprint)
Mo' Bedroom
We continued to push on Christian's room and hopefully will have it done this week.
Installed a ceiling electrical box for fan:
Garage, other side, part deux
We don't have a ton of pictures even though good progress was made. Short story: we finished all the termite damage replacement, simil...
-
We need to get bathroom plumbing done. But since the 2nd floor bath is directly above the 1st floor bathroom, it only makes sense to plumb b...
-
Trim: "Pure White" HGSW4006 Living Room: "Pussywillow" HGSW1494 Bathroom #2: "Icy Avalanche" HGSW1497 Kitchen...
-
So both from termites and water damage (due to lack of gutters) we need to clean up a lot of the bottom plates. First remove exterior siding...