Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.  

Short story: we finished all the termite damage replacement, similar to previous posts.  The back corner post had similar damage to the front corner, which required replacing two studs from ground up to about 6' in addition to the bottom sill.


Once the sill was replaced, we cut out about 6-12" of each stud with damage at the bottom and spliced in new supporting wood.

The bulk of the work this weekend was reframing from the old horse door to install a man door.  Since we were reusing a door that was not prehung, we had to build the frame, install hinges and trim.  Sadly we only have some final pictures.


And with door in and Tyvek complete, this side is now ready for us to reinstall siding.



Garage, other side

Now that the front and house side of garage are done, we have to work on the other two sides.  That said we do not have enough new shingles to do the last two sides.  And since most people never walk around the back sides of the garage anyway, I'm reusing wood siding and supplementing from pine inside the garage where we have to replace water or termite damaged sections.

Yep, more termite damage.


Like before, we cut out all the termite damage, splice in new studs and replace the bottom sill with pressure treated.


Unlike before, this side has a lot of water damage (in addition to termites) because the previous owner never installed gutters.  Hence rot.  So we cut off the bottom three feet and will replace.


So we begin to remove all exterior siding.

Old siding is gone.

Add sheathing.


And Tyvek.




Last Items for Garage

We're trying to wrap up the first two sides of garage overhaul, and here's what we finished.

All shingle surfaces are done.


Installed upper gutter.


Installed gutter downspout and tied to lower downspout.


Installed gutter leaf guards (not shown).

Made light mount for two lights on front of garage by laminating 4 shingles together and cutting opening for electrical box.


Lather, Rinse, Repeat

So it's today's episode of "let's do it again" we move 8' down the garage wall and repeat all the same fun steps.

1. Find rot/terminate damage in bottom plate.

2. Remove bad wood, splice in new wood. (No we didn't leave those studs floating in the air.)

3. Add sheathing.

4. Add Tyvek.

5. Add shingles.



Shingles, anyone?

After shingling the entire house 2 years ago, it was good to take a break. But shingling can be fun, so we're back at it with the garage and leftover shingles.

This wall is super short and quick to complete.


Working up a roof pitch is always fun (and slow).


But once trim is applied, it's a lot cleaner.


We round the corner, and also apply window trim.



Termites and water damage has to go.

So both from termites and water damage (due to lack of gutters) we need to clean up a lot of the bottom plates.

First remove exterior siding:


Not shown: use a column to support the load on this wall.  Then cut out the damaged section of studs:


Remove the bottom plate, replace section with pressure treated lumber and splice all studs:


Add new sheathing and Tyvek on exterior and voila - ready for shingles:




Garage Siding

The siding on the garage needs to be improved, and likewise we need to address the termite and rot for some of the studs.

We start with storage because we already cleaned that up in May 2023: 

Add sheathing


Add some Tyvek:


Put trim on corners and start shingling:



(We ran out of nails, hence partial progress.)






Garage Door #4

We're almost done with the front of garage, here's the latest.

Finish door trim on both sides and corners.


Begin shingling the entire field.


Add some decor at gable end to match the house:


And voila, nearly done:


Garage Door #3

 Gotta keep garage door progress moving ahead...

First add sheathing:


Then follow with some Tyvek to prevent water/wind inflitration:


Add PVC trim on sides of door opening:


Add PVC trim on top of door with z flashing:



Garage Door #2

This is a little lather, rinse, repeat from our previous post. But the termite damage on the left front corner was pretty exceptional. From afar the left corner doesn't look too bad


Upon closer inspection, the termites bored from ground up to the top plate, almost 10' off the ground.


So we support the corner with a temporary column and begin to demo the entire corner post.


We reframe the corner from ground to the top plate:


Install king studs on each side and add a header.  How does one install a header by themselves?

And voila, we have two properly installed garage headers.



Garage Door Opening

To address the various termite and framing issues, we need to reframe the door openings properly.

First remove siding 



And cut old "header" (2x4) out to make room for a proper 2x10.


Remove center post which was termite destroyed.


Rebuild center post with pressure treated lumber.


Add two jack studs on each side, header and done.



Garage Trash Storage

From the front, you can see the overhang on the right side for trash storage:

Strip off barn board:


Stud cavities full of old mice nests and poop.


Add new sheathing:


Add Tyvek, PVC trim and z flashing at bottom:



And finally shingle to match house:






Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...