Bedroom Progress

We got the ceiling fan installed in Catherine's room, which is 95% done at this point.


We moved on and spent all day in Christian's room. New ceiling drywall over badly cracked plaster:



And focused a lot of time on repairing chair rail:



And lots of drywall mud:


Loose Ends

Well, moving day is a mere 25 days away and we're not quite ready, so trying to tie up lots of loose ends.  In no apparent order...

We finished floor under stove and fridge and got both installed today, including water line for fridge.  This frees up the space they were taking in dining room so we can refinish dining room floors.





We also got the beverage fridge in pantry installed and finished trim above it.

And finished the end of the peninsula with panel and trim to cabinets.




Kitchen and More

Got a few loose ends tied up this week.

Catherine helped sand, stain and refinish her floor:




We were able to grout the kitchen backsplash





WE stained the pantry floor and under the fridge and oven




Kitchen Backsplash

WE spent all weekend and got the kitchen backsplash in (not grouted). Catherine enjoys tiling, so we had fun splitting work.




Long wall behind stove:



Short wall behind sink:





A week of small changes

Had a lot going on this week, so didn't have a ton of time to work on house. But we managed a number of small updates.

HVAC installed A/C compressors and electricians wired them up.  They will be tested next week.



Did a small amount of additional tile in 2nd floor shower. It's slow due to lots of cuts.

Cleaned most of old plumbing out of basement.

And we started the kitchen backsplash. Tile is dark, but with lighter grout and white cabinets and counters, the contrast will look good.




Kitchen Exterior and Shower

The HVAC company will be installing AC units this week, and we decided that trying to get siding up before AC compressors are in the way would be prudent.





We sealed floor grout in 2nd floor shower


Dining Room Windows, Siding and more

We replaced the two windows in the dining room, sided the exterior and started tiling the shower over the past week.

Old windows removed and reframed a touch shorter


Drywall, insulation and window opening framed

New windows installed

Exterior window trim applied

Siding started

Siding completed

And hey, the 2nd floor shower tile is starting to go up.


Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...