More Office work

Finished the office closet with shelving and clothes rod.


Next focus in the office is repairing walls behind where baseboard radiators used to be located.  You can see where there was previously wallpaper and they plastered over it:


We patch the wallpaper patches to match the thickness of the rest of the wall:


Gotta let the thick drywall mud dry for a few days before we can sand and finish these.



Closet, part deux

Spend a little time before Christmas finishing the closet - hanging door and mounting hardware.

Recall we had to strip paint from old hinges


And repainted them in black

Removed old hinges from door we were repurposing, filled old holes with glue and dowels and trimmed flush.

And voila - we hung a door. If you look very closely, you'll notice the gap at the top is a wee bit large.  Since we're reusing a door from elsewhere and the closet opening (height) was already framed, we'll accept the slightly larger opening.


After mounting hinges and latch, we're almost complete (just need shelving and rod).



All for a ... closet?

Lots of little things done this weekend, but a lot of progress on a closet.  The closet in the office has needed some finishing, so we put up drywall inside the closet


Selected board for flooring, sanded, stained and installed them.



Applied some polyurethane to floor and then framed left side for door. We have a door from another part of house we intend to use for this, so we had to get width right to match the door.

Did a handful of basement/tool improvements.  Sharpened blades on planer (and fixed a small issue with replacement part manufacturer had previously sent me).

Hung some pegboard to organize some bench storage.


Sharpened blades on lawn mower (not pictured).  Made zero-clearance insert for miter saw.


 And spent lots of time stripping paint from hinges for closet door.




Rainy Days and Saturdays

Well, it rained most all day Saturday.  Which means my desire to get more shingling done went nowhere. So we spent most of the day getting garage organized with shelving and moving things around.

The red formica shelf was previously the vanity in the 2nd floor bathroom.  This is for toys, sporting goods and ski boot storage.


And in the former horse stall, the upper shelf is 12' wide and boast the yellow formica counter that was previously in the pantry.


The lower shelf was built from leftover OSB plywood and allows us to store a boatload of stuff.


I got one of the two exterior windows installed.


The long right side has mostly toys and sports items, as well as space for 2 cars (tandem).


And the left side has room for lawn mower, snow blower, generator and one car.



Garage. Barn. Yes.

We've been using the barn/garage for storage since we moved in, and the space for car parking has been taken up by "stuff" since the back half of the barn was still dirt.  Until today. We were able to pour 4 yards of concrete and remove ourselves of a dirt floor. Once cured, we can move storage items to the back of the barn and have room to get all cars under cover before snow arrives.

This started a few weeks ago.  The concrete needs to be 4" thick, so had to remove a modest amount of dirt and level.  Moving sand is ... heavy.


And all the sand removed was used to fill the sides of driveway after paving, so nothing was wasted.


Because the dirt from the barn is very sandy, laid plastic down to stop water from leaching out of concrete too quickly.   Left side:


and right side:

And two hours of labor later, we have a floor:

Still doing finish trowel work, but this is the beginning of the end:


Next day we made relief cuts after smoothing things out.


Generator! And a little siding.

Given power issues here, we decided that a generator was probably a good investment.  And of course, to make it easier we got a transfer switch to make connecting/disconnecting easier.  So it went from mounting transfer switch and pulling wires


Connecting transfer switch to cable running outside

Pulling cable thru an already existing hole in foundation (water line used to be here)

Mounting receptacle for generator



And testing generator hookup:

Got a small amount of siding done after generator:



Soffits and more

Wanted to get all scaffolding down, which means all loose ends need to be completed - including soffits and trim.  Where the dormer meets the house creates a very tight/awkward space so instead of trying to shingle in tight quarters, I decide to give sheet PVC a whirl

Had to drive all over to find a 4x8 sheet, but I finally did.


Got PVC in corner soffit:

As well as back/side soffits cleaned up and (eventually) ready for gutters next spring.  Removed all scaffolding to move to front of house.



Finishing another side of shingles

In an effort to get things outside mostly done before snow arrives, we've been trying to get all shingling done. Made slow progress over the week getting this shingled. It's been exposed for almost a year and needs to be covered up:


Got shingles completed on side:


As well as the back side dormer. The angle of both rooflines made cutting shingles a bit more work than I would've liked.

Replaced rotted window frame on barn:


And removed both windows in barn to reglaze the panes and repaint.



Busy Weekend...

Spent most of the weekend finishing shingles on right side of house.  Stripped paint to remove olive green and painted trim before shingles were installed.



And shingles went from this 


to this

And yes, we matched the "artwork" on this gable end to the other:

Also was able to mount a small work platform under Catherine's bedroom windows to work on siding there next week.



Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...