Finished the office closet with shelving and clothes rod.
We patch the wallpaper patches to match the thickness of the rest of the wall:
Finished the office closet with shelving and clothes rod.
We patch the wallpaper patches to match the thickness of the rest of the wall:
Spend a little time before Christmas finishing the closet - hanging door and mounting hardware.
Recall we had to strip paint from old hinges
Removed old hinges from door we were repurposing, filled old holes with glue and dowels and trimmed flush.
And voila - we hung a door. If you look very closely, you'll notice the gap at the top is a wee bit large. Since we're reusing a door from elsewhere and the closet opening (height) was already framed, we'll accept the slightly larger opening.
Lots of little things done this weekend, but a lot of progress on a closet. The closet in the office has needed some finishing, so we put up drywall inside the closet
Applied some polyurethane to floor and then framed left side for door. We have a door from another part of house we intend to use for this, so we had to get width right to match the door.
Did a handful of basement/tool improvements. Sharpened blades on planer (and fixed a small issue with replacement part manufacturer had previously sent me).
Hung some pegboard to organize some bench storage.
Well, it rained most all day Saturday. Which means my desire to get more shingling done went nowhere. So we spent most of the day getting garage organized with shelving and moving things around.
The red formica shelf was previously the vanity in the 2nd floor bathroom. This is for toys, sporting goods and ski boot storage.
We've been using the barn/garage for storage since we moved in, and the space for car parking has been taken up by "stuff" since the back half of the barn was still dirt. Until today. We were able to pour 4 yards of concrete and remove ourselves of a dirt floor. Once cured, we can move storage items to the back of the barn and have room to get all cars under cover before snow arrives.
This started a few weeks ago. The concrete needs to be 4" thick, so had to remove a modest amount of dirt and level. Moving sand is ... heavy.
Because the dirt from the barn is very sandy, laid plastic down to stop water from leaching out of concrete too quickly. Left side:
Given power issues here, we decided that a generator was probably a good investment. And of course, to make it easier we got a transfer switch to make connecting/disconnecting easier. So it went from mounting transfer switch and pulling wires
Wanted to get all scaffolding down, which means all loose ends need to be completed - including soffits and trim. Where the dormer meets the house creates a very tight/awkward space so instead of trying to shingle in tight quarters, I decide to give sheet PVC a whirl
Had to drive all over to find a 4x8 sheet, but I finally did.
In an effort to get things outside mostly done before snow arrives, we've been trying to get all shingling done. Made slow progress over the week getting this shingled. It's been exposed for almost a year and needs to be covered up:
Replaced rotted window frame on barn:
Spent most of the weekend finishing shingles on right side of house. Stripped paint to remove olive green and painted trim before shingles were installed.
And shingles went from this
We don't have a ton of pictures even though good progress was made. Short story: we finished all the termite damage replacement, simil...