I've left the wall in the living room to cover HVAC lines forever, and since Christmas is coming we felt it was time to finish that. Previously I had gotten drywall up:
A few small things...
Decided while the 1st floor has been mostly done for awhile, staring at HVAC plumbing lines behind TV was old, so decided to box those in with drywall. And of course none of the walls are plumb here... Hence the pieced-together 2x4 blocking.
Snowblower sidetrip
You may recall that I rebuilt the snowblower this summer. And that went well. I got things running, reassembled and ready. And after a few months found this on garage floor:
Yeah, that's a leak. Turns out to be gear lubricant from the gear case, one of the few things I do NOT rebuild over the summer, so I guess I have a new project.
Time to take snowblower auger off:
Glazed and Confused
Well, we decided the barn could just use more natural light. Recall this past summer we added a new window to the barn. Well we could use another one. Lather, rinse, repeat:
We need more light in the back wall on this side:
From barn, we have a couple of remaining old windows. So grab one and strip old paint:
Subscribe to:
Posts (Atom)
Garage, other side, part deux
We don't have a ton of pictures even though good progress was made. Short story: we finished all the termite damage replacement, simil...
-
We need to get bathroom plumbing done. But since the 2nd floor bath is directly above the 1st floor bathroom, it only makes sense to plumb b...
-
Trim: "Pure White" HGSW4006 Living Room: "Pussywillow" HGSW1494 Bathroom #2: "Icy Avalanche" HGSW1497 Kitchen...
-
So both from termites and water damage (due to lack of gutters) we need to clean up a lot of the bottom plates. First remove exterior siding...