Closet x3

More closet progress. Some wiring, lights and one side storage is complete.

Removed the old pull-chain single lightbulb, pulled wires into boxes




Wired two slim LED lights (one on each side):

And we now have good lighting on a proper switch.

Given the side wall is boxed out about 6" to hide the HVAC vents, wanted to make use of that dead space - so fit two shoe organizers underneath on one side:

And built some fixed shelves for the other side:

Need to paint bottom base to match trim, and add a shelf across top to clean it up, but mostly workable.


Closet Progress

Trying to complete the 2nd floor closet and unload things from our disaster of a bedroom/hallway.


Drywall the eave, and box in the HVAC duct along ceiling:


Pulling wires for new lights and switch:

Box in HVAC duct on end wall

Lots of drywall mud.


Office nearly done, and a closet too

Well, lot of progress in the offfice and we're about a coat of polyurethane away from "done".  Finished patching walls


Primed and painted all trim

Walls and ceiling painted

Light sanding of floors, clean with mineral spirits:

Stained over very worn floor boards

Urethane!

Replaced and properly grounded all electrical outlets, wired switch up to light in closet.

A little progress in upstairs closet with more drywall and mud


Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...