Yard

The yard has mostly been neglected-  just trying to keep grass mowed and weeds at bay. That said crabgrass has taken over a large part of the yard where we seeded in the spring (because I didn't apply a pre-emergent to stop crabgrass ahead of time).  This is the crabgrass-covered stretch:


Was able to find a water-soluble and crabgrass-selective herbicide - meaning it won't harm the "good" grass hiding under all the crabgrass.  After applying it worked great - you can see in the picture below I missed a spot (green) and the affected crabgrass around it (yellow).

So the plan is to let crabgrass die off, use a thatch rake to remove as much as possible, overseed and water later in the fall when evening temps are cooler.  

More windows

Well, I decided having a side of the house half done looked silly. Not to mention all the windows on that one side were ready to be replaced, so we moved forward with all of them.

Stripped lower shingles:



And new windows installed:

Prime/paint interior trim:

Jambs installed:

And primed:

Interior trim applied and caulked - just final paint remaining.



More windows

We've been doing less house work given the amount of time jobs require as of late.  But managed to get two more windows in the master bedroom this weekend.


Stripping shingles



Tyvek 


and windows



Garage, other side, part deux