Bathroom, Dining Room and Yard

 Today was super exciting in that we flood tested the shower pan liner. Which is about as fun as watching paint dry because you have to let it sit for 8-12 hours and see if any water leaks out. But hey, progress.


Yes, the easiest route is to plug the drain with a water balloon.

We used some gifted reclaimed wood to build casing around dining room opening into kitchen.

Cut:


Plane:

Sand:

Casing installed:

As for the yard, we have grubs.  Lots of them and they destroy everything.


This is all dead - raked out.  Need to treat for grubs and reseed.



Bath, Bed - and a Tree

Trying to make progress on multiple fronts - both the bathrooms and one bedroom. 

We were able to complete the bathroom mirror trim, GFCI outlet and install mount for light fixture.


Was able to work on drywall in bedroom as well as closet.  Still have yet to tape and mud.




And we have a baby pine tree.



Bathroom 1+2 Progress

We're making progress on both the 1st and 2nd floor bathrooms.

2nd floor bath Drywall and window trim finally complete.




Window trim (and plumbing supply/drain rough in)


Built a soffit over 1st floor shower to accomodate vent fan. Why? Because we couldn't vent it mounted in the ceiling thru the wall due to a very large beam we couldn't cut thru (without causing serious damage). So the soffit allows the vent duct to run about 8" lower down the wall and avoid the beam completely.


Vent duct thru wall.

 




Bedroom

We're trying to get the kitchen, bathrooms and at least one bedroom close to completion.  As such we're splitting time between them and needed to spend more time on the bedroom.  We had previously replaced the ceiling with new drywall as it had to be removed to insulate.  

We completed the window trim for three windows.  The two facing the side yard have larger than normal trim on upper header to cover the old window opening (these are slightly shorter).


The window seat overlooking the sun porch has smaller than typical trim because of how close it is to the ceiling/dormer

I then was able to mud the joint between the ceiling and walls around the entire room.  Also had to make a small drywall repair over closet door where HVAC vent hole was cut incorrectly by contractors as well as a few cracks in walls over some of the windows.







Kitchen!

 Houston,we have a kitchen.  Well, the makings of one with counters and a working sink.  So it feels real.








Bathroom Plumbing

We need to get bathroom plumbing done. But since the 2nd floor bath is directly above the 1st floor bathroom, it only makes sense to plumb both at the same time.

Working from the bottom up - start with the 1st floor sink drain


Then we work up to the toilet flange on the 2nd floor:


And then we add in 2nd floor shower and sink drains

2nd floor toilet flange installed

2nd floor sink drain 

2nd floor shower drain


Bathroom Progress, 3

 A few delays posting items, but the bathroom has started to take shape. We finished cutting all the tile and grouting.


Applying grout

 First pass at cleaning


Second pass cleaning


Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...