Once upon a time there were three little sliding doors.
And then they were gone.
Late rain coming, so trying to get portico shingled before rain starts.
Cutting shingles for starter course.
Took Saturday as opportunity to clean out garage, empty furniture from sunporch into garage and start demolition of sunporch sliding doors.
Better garage organization and furniture storage.
The usual dose of yard work (mowing, weed wacking, shrub trimming) but also removing some dead tree limbs and chopping them up.
Like every September here, the grass is loving the cooler weather and some water.
With a visit from building inspector, I had two small items to do and then can finish the portico. So We added an additional 2x4 on each post
That led to adding roof sheathing, tar paper and drip edge so roof is done (aside from shingles).
Since we haven't settled on shingle color, I moved onto other projects.
We've had two sections of cedar fence waiting to be installed around the propane tanks for a few months, so we got that done. Cut panel lengths to size:
Given bathroom is nearly done, reverted some time back outside to get things moving. Spent most of weekend shingling and getting the portico framed.
Mowed lawn, thatched and took some time to clean thatcher.
We don't have a ton of pictures even though good progress was made. Short story: we finished all the termite damage replacement, simil...