We don't have a ton of pictures even though good progress was made.
Short story: we finished all the termite damage replacement, similar to previous posts. The back corner post had similar damage to the front corner, which required replacing two studs from ground up to about 6' in addition to the bottom sill.
Once the sill was replaced, we cut out about 6-12" of each stud with damage at the bottom and spliced in new supporting wood.
The bulk of the work this weekend was reframing from the old horse door to install a man door. Since we were reusing a door that was not prehung, we had to build the frame, install hinges and trim. Sadly we only have some final pictures.
No comments:
Post a Comment