Short update: Got some more cleanup and paint done.
Painted a few ceiling tiles that were badly stained. They match much better now.
Short update: Got some more cleanup and paint done.
Painted a few ceiling tiles that were badly stained. They match much better now.
More bathroom progress.
Installed new lock/deadbolt on all doors.
Flashing above door. We also painted all trim and spray foam (not pictured) grey so it doesn't stand out as much.
We got the basement door replaced last week, now time to start tackling the bathroom which was long overdue for some love.
Remove sink:
While we have no shortage of home projects, we have a couple of beach things that have been lingering. The most important is to get the downstairs flooring replaced to match the upstairs from last winter. However, the downstairs bathroom and exterior door needs some love, and we need to get that done before the flooring can move forward.
Let's replace a door.
Buy a door (that fits the opening you already measured many times).
We don't have a ton of pictures even though good progress was made. Short story: we finished all the termite damage replacement, simil...