Busy Weekend - Sunday

The first order on Sunday once rain left was to move scaffolding, which takes a few hours.  Goodbye left side

Hello right side.  We've missed you.


Once setup, we had to remove more old shingles, apply more tyvek and start shingling again.

Also rebuilt one minor piece of trim in pvc since the wood was rotted.  It doesn't look like much, but it's more progress.



Busy Weekend - Saturday

Saturday was a rainy day, so we spent much inside on trim for kitchen and bathroom hallway.


Got more trim cut and painted (but not yet installed)

Spent a little time on a side project to wire my basement dust collector with it' own on/off switch to make it far easier to use. Except the first attempt failed with a short in the wiring. Finally found where wire was nicked and causing short circuit.  Second attempt was perfect.





Pond side shingles

I was able to shingle the side of the bedroom facing the pond.  Recall that we had stripped these earlier in the week

Worked shingles around the lower gutter and then up roofline.


Finished up to the roofline and primed the soffit white.



Front Door

Had opportunity for Joe to help with replacing front door.  So we went from this


To this large hole:

From inside:


To a new door:



Weekday/Night Progress

Trying to keep some semblance of progress moving ahead, so squeezing in projects at lunch, at night and wherever they fit in.

We had shingled the lower section before propane tanks were delivered, but the upper section remained for months.  


Finally got those old shingles stripped, corner trim applied and tyvek.

Managed to complete window trim for office and prime it, still needs a coat of paint.

And removed one small wall section of barn/garage to make parking inside easier.

Oh, and we cleaned out all the trash with the arrival of a dumpster. Sarah offered amazing help, which sped the loading immensely.  Someone came to check the dumpster out.





One Side, done?

After a bunch of work this week, we completed one side of the house.


Was able to complete a fun inset on the gable end where we removed a window in the attic.

Was able to finish put mud on drywall in the kitchen that had been lingering for months.

New front door arrives this week.  Removed the trim to prep for door removal next week.


Can you say "water damage"?


Odds and Ends

Today was a day to get a handful of things done, knowing that heavy rain is coming tonight.

First order was finish stripping paint on the gable end to prep for white trim paint.  Have I mentioned that I hate stripping/scraping old paint?


While I have a hand wire brush, this mounted on a drill does make things fast. (And super messy.)

Once olive paint is mostly gone, applied white primer.


Applied shingles over both upper windows to prep for later, and the gable end is (primed) white.


Most of soffits are in decent shape but the ends under gutters have a fair amount of water damage. 

So we remade both soffit ends with PVC.



And installed window jambs for last two windows (office).



 

More fireplace and more siding

 We got a lot more of the west side shingled.


And my least favorite job: stripping/scraping old paint, but olive green must go


And a surprise - what are all these triangles and cut shingles?



And the fireplace is nearly done, aside from some paint.



Fireplace and Siding

Worked a bit on fireplace and test-fit the mantle, but it can't go in until I finish the rest of fireplace surround.



And today was the day I finally decided to bit the bullet and setup pump jacks scaffolding.  This makes siding upper areas much faster and safer.


Getting it setup took 3 hours so I only got about 5-6 courses of shingles applied. But they go in so much faster when working from a stable platform.  Unfortunately light rain moved in, so I had to cover everything and move onto inside work.



A wall, a hall, a small victory

We were able to erect the wall to close in the bathroom hallway, apply first course of drywall mud and get storage cabinets in place.





And shingled the lower right side of front of house, along with the outside bathroom wall.






And then there were ... none.

More little items and the last two windows are in.  That's 26 in all.

Rewired (and grounded) living room outlets:



Built mantle (in upright position here for gluing)

Starting to apply stain/finish coat:

Lots of window trim (three upstairs windows)

Finally last two windows installed.


Trim applied to corner of house. Had to get creative and work around power lines.  We'll just paint the small section of olive trim white.




Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...