Collection of random drawings and plans.
Blind corner kitchen cabinet pull out - minimum measurements.
Collection of random drawings and plans.
Blind corner kitchen cabinet pull out - minimum measurements.
Eventually entire house will be resided and new windows installed. We're tackling a few small areas at a time, and these are starting points.
Started with wall section where propane tanks will be installed - get it done before tank delivery.
Started to work on 1st floor bathroom by replacing toilet, retiling tub surround and removing old floor tile. Old window was replaced and shifted left slightly so it didn't run into tub surround.
Old toilet and tile base removed:Pretty much everything in the kitchen was removed, down to base subfloor and studs. We saved all original flooring which I'll plane (resurface) and lay back down.
We knew many systems in house would need work and water main/supply was on the list. Norfolk confirmed we had one of the oldest in the town (estimated at 50-60 years or more). The water supply line was very rusty iron, and had lead gooseneck connectors on each end. So with some calls to your friendly excavator (And a check for $5,000) you too can have that all replaced with new plastic lines.
Original (rusty) cast iron supply line
Basements aren't sexy for most people, but I kind of love them. This doesn't have opportunity for a finished basement, but has good bones for workshop and some storage.
The bedrooms mostly need cosmetics but the one overlooking the sunporch (Catherine's) will need some work to built a closet in the eave of a dormer.
The sunporch offers great space with natural light and views of pond. It's gonna need lots of new windows and cosmetic work however.
We don't have a ton of pictures even though good progress was made. Short story: we finished all the termite damage replacement, simil...