Weekend Rain

Some weekend rain derailed our plans to finish walkway, but we continued with a handful of things regardless.

Remove sand from edges of walk where we want grass, fill and pack tightly with top soil and lay seed (before rain shows up).




Start assembling gutters for garage.


Add end caps:




I can see the finish line...

We didn't get the entire walkway done this weekend, but got very close.  Since we had the tail end of a hurricane, started in the house working on closet.

Last cleanout - remove final radiator cover:


Cleanup wall and drywall:


After rain stopped, head outside.  Laying final sand bed up to front entrance


And lay brick up to entrance

More curves to be cut:


Walkway up to front door.




More Yard Work, but cut short

Rian on Sunday derailed any progress, but Saturday was productive.  A mix of walkway and grass work ensued...

We rushed to get grass things moving as lots of rain forecast for this upcoming week.  Spot treated crabgrass:


Replaced worn tines in thatcher:


And thatched lawn. Twice.


Planted some grass along one side of walkway.


And managed to lay another 30' of walkway brick:






Long Weekend of Yard Work

It was a long weekend, so opportunity to get lots done.

First finish the short stretch to driveway.


Voila.


However, the last 2 feet or so settled a little lower than desired, so we remove those, add some more sand, and reinstall.


Install long stretch towards front door.


Cleanup and laying woodchips (break from laying brick)



Grading patio before woodchips





Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...