Pantry Window

A small victory getting the pantry window replaced and trimmed in short order.


Old window:


Window removed:

New window installed:

Drywall and insulation installed:

Window jams cut and installed:

Window trim installed

Window trim painted.


Shower progress

We were able to tile the upstairs shower and go back to add more wall tile to the 1st floor shower (which had been on hold for months due to other projects).

Upstairs tile laid.

Time lapse fun.



Back to cutting and installing wall tile in 1st floor shower.



    

We started putting kitchen cabinet doors on, and I got the first corner storage pull out installed.


Two bathrooms walk into a Kitchen...

We made progress in a few unrelated areas lately.

The upstairs shower has tile cut and dry fit - but not installed yet.


The downstairs bathroom has a new drywall ceiling - but no mud yet.

And we got the vent hood surround installed.  


Wasn't going for a box look, but a lot of limitations due to size, ceiling height and those exposed beams led us in this direction.


Yard Work

Took advantage of weather to work in yard.  Spent lots of time clearing stumps, finishing the trench to run new electrical to the barn/garage, and tried to get water on some grass seed.

Dug trench to barn


Laid new electrical cable and covered with bricks from old chimney, and then buried it all.

Stumps - mostly small ones - litter the yard with all the brush we cut.


Small sample of the stumps removed.  We probably pulled 20+ over the weekend.

Bathroom, part 3

We're making slow but steady progress in the bathroom upstairs.  Not pictured is that the entire bathroom (walls and ceiling) have drywall finished and primed.

Shower has cement backer board installed


Joints and screws sealed with alkali resistant joint tape (quite different from drywall tape) and mortar, then fiberglass tape and waterproofing applied

First coat of water proof membrane applied to entire wall

Second coat of water proofing applied (it's the same product as above, just in a different color because it was bought at a different store).  We'll need one more coat on walls, and two more coats for the floor/wall seam.


Bathroom, x2

Making progress on both bathrooms.

1st floor bathtub got reglazed in white:


2nd floor shower progress - plumbing and valve installed:

Mixing mortar for shower pan:


Shower pan poured - pitch looks great.

Kitchen Updates

Lots of progress in several different areas.

In the kitchen, we stained the vent hood surround to prep for finishing. Before/after staining:


Vent hood front after staining

Vent hood left side after stain:

Vent hood right side after stain:


Finished trim for dining room opening

As well as replacing trim up against joists.

Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...