More work to prep for paver installation.
Spread and leveled remaining gravel.
More work to prep for paver installation.
Spread and leveled remaining gravel.
It didn't go as quickly as we might've thought, but the walkway paver base is done. In short, excavate grass/dirt and fill with gravel leaving approx 3" for paver and sand.
Installed the last section of downspout drain under patio.
Day 1 of digging was fun, but things are moving a tad slower than I might like.
Started to clean up all the overgrowth for the old patio.
We're starting the paver fun. Today a mini-excavator was delivered and we begin digging out all the grass where pavers will go.
It's small which means we don't have to be quite as careful as with a larger loader like a Bobcat. But it also means more trips to dump grass, which takes some time.
This is about 2-3 hours of digging.
Later this week we'll be excavating for new walkway and patio. Before we do that, however, it's important to get any lines, electrical and drains run under walkway. Cuz digging up brand new walkway after installation is not fun.
First remove last of old pavers to be reused somewhere else later.
We don't have a ton of pictures even though good progress was made. Short story: we finished all the termite damage replacement, simil...