Shingle milestone

Well, the front of the house is essentially shingled. Some small trim details to address, but that's of small concern.

This weekend was cold, to while waiting for temps to rise (and melt frost on grass and roofing) we did some other tasks.


Sanded and put polyurethane on bathroom door.


And same for closet door (well, paint not urethane).


Last weekend we finished shingles on left side.  Pulled the leftmost scaffolding post down and moved to other side of house.


With scaffolding moved, we got shingles moving on right side over portico.


And finished shingles Sunday.

Got primer on rest of soffit.  Once we paint trim paint on soffit all scaffolding will come down in front.

The story of a wall...

There was a wall. And it had some wallpaper on it.

So Catherine removed the wallpaper.

Painted the wall (and refinished floors)

But the wall was cold.  So we busted a hole thru.


And spray foamed the daylights out of it.

But then we had a lonely hole to repair.  And Catherine wondered if we could make use of it. So we did.  Made the hole larger.


And built some shelves for the opening.


Added trim and primer.

And some final paint. Voila. (And the outlet had to move over about 18".)



More shingles and an arch...

This isn't McDonald's golden arches, but it's ours.


Finished assembling the portico arch in the basement.


And take this framed arch:


To this: finished and pretty. Now we have lots more trim to do.


And worked on shingling left side. From this:


To this:



Siding and more.

We have some lingering areas to be shingled that involve small/short shingles under windows and vents. These are hard to "just cut them to size" because they're prone to splitting. Here's the kitchen vent:


The way we solve this is by cutting short shingles, gluing them to a thin piece of wood and then nailing thru the shingle and wood - this stops them from splitting.


Got some of PVC trim on each side of portico.


The next big project is cutting PVC trim in perfect arch to match the framing here:

Well, we have a plan for that.  When building the arches above, we framed 2x6, and then used a string with a 50" radius to scribe the arch.  So we mounted a router to a piece of wood, put a screw at exactly 50" and used that to cut PVC. Like this:

Time Lapse:


Real time (second cut):


Voila! Instant perfect arch.



Mid-week projects

Actually got a couple of projects done mid-week.

We need to improve insulation around Catherine's room - it's noticeably colder than others.  And from a few images (before) you can see lack of insulation.


Add more spray foam.


It's a fashion statement.


We refer to this corner of dead space as the "hidey hole". It's walled in, so we had to remove some drywall to gain access.

Start of insulating in the hidey hole.


And since rain is coming, rushed to get trim installed over sliding door in sunporch - it is a flat roof and drains over this side.  We don't want all that water running into soffit.  We have yet to install gutter...



More water damage

Today's short work was mostly about removing more trim with serious water damage.

This was short section under old gutters:


This section was just above gutter.  Entire piece is wet and spongy to the touch, not ideal for wood.


This is right side near downspout where most water from this roof drains. Clearly, it's been running into trim for years - the light fixture (removed, wires cut and set aside) I pulled out of wood with my bare hands because wood was so rotted.  And the 2x4 supporting the trim was also swiss cheese.


This is same section above, with new pressure treated 2x4 installed and trim replaced.


With rotted trim removed and supporting structure replaced we can get some PVC trim to install later this week which will never rot.

Also removed all the lingering nails from shingles above the sliding door.  We'll get Tyvek on that when we replace trim.



Slider wall

Today was mostly about getting sliding door exterior wall setup for shingles.

Started by stripping shingles.


After examination, lot of water damage for lower right corner - both sheathing and studs have lots of rot.


Decide to cut out lower 4" or so to remove all the rot.


Add three pressure treated 2x4s to fill void from rotted studs.


Get sheathing up.


Apply Tyvek, caulk slider frame and screw it in, then apply final water seal tape over slider flange. This is water tight.



New sliding door not so awesome.

This past week, we were able to get the sliding door installed along with the two sliding (moving) panels, but didn't complete everything (hardward, locks, etc) because there's a slew of other items we need to complete.

When looking at the door in the closed position something didn't look right to me today.  And I was right.


When both doors are closed, they actually don't meet in the middle - they remain about 1" apart and there's a piece called "astrigal" that fills the gap - but we hadn't installed that piece yet. 

When looking at the door, the gap between the left and right sliding panels didn't seem consistent - it was warped or bowed - wider in the middle than at top/bottom.  

This is the left door panel with a level applied - it's perfectly straight - there's no gap between level and door.


However, the same cannot be said for the right door - see the gap between the level and door? That's because the right door panel has a curve in it and is almost 3/8" narrower in middle than at top/bottom.  Tools don't lie.

When closed, the gap at top of doors is 1 1/16"


But without moving the doors at all, the gap in the middle is 1 7/16" - almost 3/8" wider due to bow in right door.

I sent all of the above to Lowe's and they, in turn sent it directly to door manufacturer. I got a call back from the door manufacturer in under 30 minutes where they acknowledged the issue and immediately ordered me a new right panel - no questions.

(Side note: the door representative acknowledged why this happens and that indeed it's not supposed to.  Clearly this isn't the first time he's dealt with this problem - he explained to me exactly how it happens.)



4 panels + 3 people = 1 sliding door

Joe had the day off from work, so we took the offer of free labor to have him help move the large, 4-panel sliding door and get it moved into the opening.

Removed tarp, trim boards and cleaned debris.


Measured door. Three times. Had to make one small adjustment to framed opening but that took 5 minutes and we were ready.


And slider is installed.  I don't have any in between pictures because I was busy moving this large thing.



Prep for one big slider

Preparing sunporch for new 12' slider.

First had to cut concrete and widen base about an inch as new slider is wider than old sliders.


Then chisel out old bricks.


Use angle grinder to smooth concrete - before and after:


Framing opening (plumb is good)


Opening is ready for door.




Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...