Lots of small items to finish.
Video doorbell installed and working.
Lots of small items to finish.
Video doorbell installed and working.
Starting to finish closet floor - with more sanding to follow.
Some shiny polyurethane.
We've tackled two side jobs recently.
New car mean new trailer hitch. So we found one that fit from etrailer.com
Secondly, we finished the last small section of basement floor concrete that needed some love. We had a big hole here, almost 3-4" deep we needed to address.
First we fill the really deep section with concrete. This is far cheaper than self-leveler, and you're not supposed to pour self-leveler more than 1" or so.
Need to sand down closet floors to prep for stain and refinishing.
Earlier in week we started sanding edges and this weekend rented a floor sander.
While we had sander, we did a first quick pass into hallway where floor is badly in need of refinishing. We have a lot of edge sanding left here.
We don't have a ton of pictures even though good progress was made. Short story: we finished all the termite damage replacement, simil...