Closet Work

After looking at closet systems and what we wanted, decided to DIY this one (shocking).  

So a few measurements to check things:


And outlet placement.

And now we have plywood cut all over the basement.

Sides and small pieces waiting to be cut (again).


Side/vertical supports.


Shelves for one section.


Long list of plans and cut list:



MIA

Holidays arrived and we haven't posted but work has been progressing.

Working on basement storage to improve things.


Storage wall is slowly taking shape.

Also reinstalled miter saw.


Wood nerd: my first French cleat for storage box.

More storage to come because this is a mess:



Basement and more

Keeping a few items moving and improving basement at same time.

Cut up some older beat up tarps, added grommits  and used to cover AC compressors keeping leaves and snow out.


Added second coat of urethane to bathroom hallway :


Added new table for sanding in basement - all those tools won't be on it when in use, this is just temporary:


Tools removed from old pegboard wall storage for an upgrade.  Ripped out pegboard and replaced with leftover maple flooring and will attach tool holders for better storage.



Odds and Ends

Lots of small items to finish.

Video doorbell installed and working.


Bathroom hallway is fully sanded, soon to be stained.


Emptied old gas from generator and refilled with clean stuff.


Mounted new miter saw


Dust collection for miter saw reinstalled


Look how snug to the blade this new dust collector sits. That's sexy.

And installed a small section of baseboard.



Closet Floor and a doorbell

Starting to finish closet floor - with more sanding to follow.

Some shiny polyurethane.


While waiting for floor to dry, we begin to sand bathroom hallway. It's too small to use a large drum sander, so we have to do it by hand.


It's somewhat slow, but you get a good result in the end.


We attempted to instal video doorbell, but had trouble. Took some time but determined it was the wire, so we pulled a new one to doorbell:


Now that basement floor is cleaned up, we're slowly cleaning and putting basement tools back in place.



Side Jobs

We've tackled two side jobs recently.

New car mean new trailer hitch.  So we found one that fit from etrailer.com



Frankly it was a pretty easy install, with the sole exception of removing the muffler hangers so the muffler drops down while we install the hitch to the car frame.


And voila, hitch perfect fit.



Secondly, we finished the last small section of basement floor concrete that needed some love. We had a big hole here, almost 3-4" deep we needed to address.

First we fill the really deep section with concrete.  This is far cheaper than self-leveler, and you're not supposed to pour self-leveler more than 1" or so.  


After letting the concrete above sit for 2 weeks, we mix three batches of self-leveler


And dump self leveler.  Push around with a rake to "encourage" it to spread to all edges and let it sit. For days.



Closet Floors

Need to sand down closet floors to prep for stain and refinishing.

Earlier in week we started sanding edges and this weekend rented a floor sander.



A little touch up around edges and we'll be ready for stain soon.


While we had sander, we did a first quick pass into hallway where floor is badly in need of refinishing.  We have a lot of edge sanding left here.


Cleanup, Cleanout

Lots of small things, and one big thing.

The sun porch was the last major construction on the house where we did serious demolition.  Since it would take time,  we didn't get a dumpster right away and stockpiled trash behind the barn.  This was the start:


And while you can't see the entire pile, it's off to the right here - and it was large.


Since we finished the walkways and the driveway was now open it was dumpster time. And throwing things away feels good.  Dumpster full:


Behind barn, empty:


And one side project: we had previously resurfaced the basement floor, which is amazing.  However we had one small area in the corner that was almost 4" low. So before we finish the floor in this area we had to fill in and get it close to level (within an inch or less).  So, a few bags of concrete and voila:


And no, we're not removing the large water tank embedded in the foundation.  That's a lot of useless work.


Garage and Yard Work

Spent some time with yard and garage cleanup before weather is ... cold.

But first a detour for some interior work - got closet walls primed.





In garage, the outlets are original - perhaps 40 years or so. And many are loose, meaning plugs fall out of outlets, etc.  As such we decided to replace several of the outlets we use all the time. And they're so old, the first two literally fell apart when I disconnected power and removed them.


Cleaned up the remaining sand from driveway.

And spread the remaining woodchips.  This is what remained - lots of roots growing into woodchips...


Inside garage, removed wood from next to window:


Cut old bookcase down to size and installed for storage.



Landscape + Cleanup

Spent some time with cleanup just to make yard look more presentable.

Get a few yards of top soil delivered.


Rake as much of sand and gravel away from edging as possible, and then backfill with clean top soil.


Bought 15 hostas and plan on 3' spacing.


Backfill hostas with top soil


Spread rest of top soil evenly over the area.  We'll add weed block and wood chips soon.



Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...