Today we got the last two windows in Christian's room installed. A progression:
Two windows entered a shower, and ...
Today we were able to finish the bottom course of tile in the 2nd shower. We still have a small amount of upper tile to finish, but we need to get answers about the shower door we purchased first.
We decided with good (but not too hot) weather to take opportunity and work on windows for Christian's room. Most of what needs to be done at this point is stripping shingles outside and then install new windows.
One window is completely in:
Day 5/6 Projects
Working on more projects to keep things moving. Catherine helped mom wallpaper the pantry wall.
Subscribe to:
Posts (Atom)
Garage, other side, part deux
We don't have a ton of pictures even though good progress was made. Short story: we finished all the termite damage replacement, simil...
-
We need to get bathroom plumbing done. But since the 2nd floor bath is directly above the 1st floor bathroom, it only makes sense to plumb b...
-
Trim: "Pure White" HGSW4006 Living Room: "Pussywillow" HGSW1494 Bathroom #2: "Icy Avalanche" HGSW1497 Kitchen...
-
So both from termites and water damage (due to lack of gutters) we need to clean up a lot of the bottom plates. First remove exterior siding...