I've left the wall in the living room to cover HVAC lines forever, and since Christmas is coming we felt it was time to finish that. Previously I had gotten drywall up:
Subscribe to:
Post Comments (Atom)
Garage, other side, part deux
We don't have a ton of pictures even though good progress was made. Short story: we finished all the termite damage replacement, simil...
-
We need to get bathroom plumbing done. But since the 2nd floor bath is directly above the 1st floor bathroom, it only makes sense to plumb b...
-
Trim: "Pure White" HGSW4006 Living Room: "Pussywillow" HGSW1494 Bathroom #2: "Icy Avalanche" HGSW1497 Kitchen...
-
So both from termites and water damage (due to lack of gutters) we need to clean up a lot of the bottom plates. First remove exterior siding...