Decided while the 1st floor has been mostly done for awhile, staring at HVAC plumbing lines behind TV was old, so decided to box those in with drywall. And of course none of the walls are plumb here... Hence the pieced-together 2x4 blocking.
Subscribe to:
Post Comments (Atom)
Garage, other side, part deux
We don't have a ton of pictures even though good progress was made. Short story: we finished all the termite damage replacement, simil...
-
We need to get bathroom plumbing done. But since the 2nd floor bath is directly above the 1st floor bathroom, it only makes sense to plumb b...
-
Trim: "Pure White" HGSW4006 Living Room: "Pussywillow" HGSW1494 Bathroom #2: "Icy Avalanche" HGSW1497 Kitchen...
-
So both from termites and water damage (due to lack of gutters) we need to clean up a lot of the bottom plates. First remove exterior siding...
No comments: