Beach detour

While we have no shortage of home projects, we have a couple of beach things that have been lingering.  The most important is to get the downstairs flooring replaced to match the upstairs from last winter.  However, the downstairs bathroom and exterior door needs some love, and we need to get that done before the flooring can move forward.

Let's replace a door.

Buy a door (that fits the opening you already measured many times).


Strip trim from old door.


Remove old door.


Cleanup all scrap for disposal.


Remove old adhesive and schmoo from concrete.



Install new door and level.


Lots of loose ends, but just replacing the door makes a huge improvement.


No comments:

Post a Comment

Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...