Beach Basement Bathroom, part 3

More bathroom progress.

Installed new lock/deadbolt on all doors.


Filled old floor drain and door track with concrete to level floor.

Flashing above door.  We also painted  all trim and spray foam (not pictured) grey so it doesn't stand out as much.


First coat of paint on new basement door to match others.