It's time for a real closet.

We're building a large walk-in closet in bedroom and it's time to get moving.  We need to remove one wall, which is going to be a very dusty mess.  So we're building the 1st new wall for the closet first in an attempt to contain dirt/dust away from the bedroom itself.

This is the wall to be removed:


Put up some plastic sheeting to contain saw dust while we build new wall.


Frame one side of wall


and both halves are framed.  There's a large opening because we're using two pocket doors.

Install track for pocket doors from a header.


Install metal studs where pocket doors will slide.



And drywall for two sides of closet (we'll fill in the small upper section shortly).