Basement done?

The basement isn't 100% done - but it's back in a workable state.  We'll make some more improvements later, but need to get back to some real house projects.

Table saw is back and now the floor is actually level.  (We used to have to shim one of the legs.)



Rebuilt the miter saw station, but only on right side.  Currently mulling different use of the space on left side...


My portable air filter on casters (and junk collector since it has a lot of space on top) is good.



Dust collector for saw/planer is moved to new location and re-ran PVC pipe for ductwork.  Also reconfigured the dust collector - the blue barrel is now 1st of two stage separator, which collects the majority of sawdust before it gets to large filter and plastic bag (on the right).




No comments:

Post a Comment

Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...