Goodbye Ceiling

As mentioned we have crappy insulation in the 2nd floot bathroom and none in the (short) adjacent hallway.  So this weekend we removed more ceiling and any debris to prep for insulation (later).

This is the ceiling section we're removing:



After some quick cuts, the ceiling panel fell down very easily in a solid section (until it hit the floor).  Note the complete lack of insulation - that's the roof sheathing you're looking at:


There was some debris that fell down. And a dead squirrel. And three dead birds. I'll save you from those pictures.


And we're adding a ceiling light in this short hallway because it's dark, so I ran a new electrical box for switch.