2nd Bathroom, take 2

One of the few benefits of delaying work on spaces is that a house reveals itself to you.  And after going thru winter snow we discovered the 2nd floor bathroom insulation was poor, leading to lots of snow melt:


So we need to remove the 2nd bathroom ceiling and take the opportunity to insulate properly (with spray foam) and seal it well.  Yes, we have to remove a perfectly good ceiling:


Hello poor/gapped insulation:

And after some cleanup and removal of old plaster:


Already took delivery of spray foam insulation, so when it's a touch warmer we'll remove all the old insulation batts and spray the entire ceiling.

We've also been working on more walls in bedroom.  Paint is almost done, working on trim and chair rail next.