We continue to make slow progress on the walks, mostly due to weather and life schedules interfering.
While we've had some rain, I wanted to get my pond pump working and - it was not. The pump runs but no water. So we need to wade into pond to investigate.
And there it is, a cut supply line to pump. I'll guess a turtle or some other animal (?) munched it. Cut, put a splice in and we're back in business.
Next we're pretty close to laying pavers, so we fine-tune the patio elevation. Make a grid with approx 2-3' squares and measure height in each one.
This is what it looks like on paper:
It's generally very good - just a touch of slope (approx 2") away from house, but there's a small low spot near the middle. So we remove approx 1/4" of base from RED and move to GREEN, compact again and then check with level to ensure it's sloped correctly.
No comments:
Post a Comment