It didn't go as quickly as we might've thought, but the walkway paver base is done. In short, excavate grass/dirt and fill with gravel leaving approx 3" for paver and sand.
Installed the last section of downspout drain under patio.
It didn't go as quickly as we might've thought, but the walkway paver base is done. In short, excavate grass/dirt and fill with gravel leaving approx 3" for paver and sand.
Installed the last section of downspout drain under patio.
We don't have a ton of pictures even though good progress was made. Short story: we finished all the termite damage replacement, simil...
No comments:
Post a Comment