We want to finish the closet drywall, but we can only do part of that because we need to finish wiring for bedroom and closet lights.
But fist a detour. We had already removed the wall and patched the floor, leaving part of the wall where HVAC and plumbing lines were run to attic.
After looking at the wall all week, we decided we could remove another 16" (to next stud) - near the white PVC drain lines in image above. This would just give it better look and function. So, we started back with more demolition - stripping plaster, lathe and wood trim.
After some work we removed the next section and freed the electrical outlets which will be remounted when we frame the HVAC lines in.
Of course, this meant we had to patch a bit more flooring as well.
We framed in the HVAC lines using the old studs removed from this wall and drywalled the small dead closet space (we have plans for that space). Reinstalled the electrical outlet in the new framing.
And then roughed in the electrical on other side of closet for bedroom and closet lights.
We need to add one more electrical box and then can drywall this final section of the closet.
No comments:
Post a Comment