Closet Demolishing Done

We previously removed the wall studs, and today was focused on building the new stud wall for side of closet and cleanup of the door to bedroom.

First we need to note thermostat wiring:


Build stud wall at end, and thread electric and thermostat wires.


Remove old door casing (intact!) which makes reusing it a lot easier.


Bedroom door is gone, but we haven't framed new opening yet.  (Door is shifting left about 10")



No comments:

Post a Comment

Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...