First we need to add two pairs of 2x6 joists, and then run two vertical supports up to roof joists that will carry the load from the hoist.

This is the first horizontal support and then the two vertical supports run up to roof joist directly above it.


This is from loft looking down - the two horizontal supports are installed and level, but the vertical support is only on the right side at this point.


Here you can see both horizontal supports and all vertical supports run up to roof rafters


The hoist will run right in the middle of the four vertical supports.