Slow sunporch progress

The weather wasn't super cooperative, and I was feeling lazy, so we didn't get a lot done this weekend.

Earlier in the week (wednesday?) we got one of the doors installed.


It actually went in fairly easily.


Temps are going to be colder next week so we needed to get trim and insulation for door and windows done while the weekend offered warmer-than-usual weather.

Assembled door trim in basement:


And voila trim installed (As well as spray foam insulation for cracks).


Spray foamed the windows and sliding door, let it set and trimmed excess (not pictured). And took time to cleanup the mess of tools and broken trim so we can work on window trim soon.




No comments:

Post a Comment

Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...