Bathroom progress and more outside.

We were able to get a lot done in the bathroom as well as outside today.

First we got the old vent fan removed:


Had to square off the old round opening a little for the new fan:


New vent fan unboxed:

And installed (wired and vent hooked up, light waiting on ceiling paint):


Trim installed around door and floors:

And storage cabinet installed:

Cleaned exterior brick


And applied water sealer (will do 2nd coat soon):

Stripped more shingles



Sanded and primed trim for last section we need to shingle before gutters show up.