Closet Done?!

 Well, we do need to put some flooring down, but this closet is essentially done.

We had to box in HVAC on left side (hence large panel) but some decent storage around/on top.


On right side, good shelving and shoe storage.

Repainted interior of door and polyurethane exterior.


Closed eave access (can be opened by removing screws, if needed).  And hanging rod end-to-end (almost 12' long)


Hopefully we move some of this soon


No comments:

Post a Comment

Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...