Garage. Barn. Yes.

We've been using the barn/garage for storage since we moved in, and the space for car parking has been taken up by "stuff" since the back half of the barn was still dirt.  Until today. We were able to pour 4 yards of concrete and remove ourselves of a dirt floor. Once cured, we can move storage items to the back of the barn and have room to get all cars under cover before snow arrives.

This started a few weeks ago.  The concrete needs to be 4" thick, so had to remove a modest amount of dirt and level.  Moving sand is ... heavy.


And all the sand removed was used to fill the sides of driveway after paving, so nothing was wasted.


Because the dirt from the barn is very sandy, laid plastic down to stop water from leaching out of concrete too quickly.   Left side:


and right side:

And two hours of labor later, we have a floor:

Still doing finish trowel work, but this is the beginning of the end:


Next day we made relief cuts after smoothing things out.


No comments:

Post a Comment

Garage, other side, part deux

We don't have a ton of pictures even though good progress was made.   Short story: we finished all the termite damage replacement, simil...