Spent time trying to get Right side of the house shingled, but also some other projects came along for good measure.
One of those side projects is need to complete floor in barn (aka: garage). We already have two inside parking spots done with old bricks as pavers, but we don't have enough bricks for the remaining floor. And leaving a dirt floor isn't an option, so we're digging out 4", leveling and going to pour concrete.
Left side storage/workspace:
More barn work: one window is broken, so we have a few leftover spares. Prepping window by removing old and cracked glazing and re-glazing the exterior side of panes:
No comments:
Post a Comment