A day of lots of little things, many not pictured.
Removed all lower trim and prepped for siding. Got a few pieces of PVC installed.
Got the second hose bib/spigot installed
Did a lot of prep work for living room baseboards. Cut profile and filled holes, need to sand and cut to length.
Cut a bunch of PVC trim for windows, assembled and installed 2 just to test fit:
And connected plumbing for outdoor hose bibs with shutoff and drain.
No comments:
Post a Comment