Bathroom, part 3

We're making slow but steady progress in the bathroom upstairs.  Not pictured is that the entire bathroom (walls and ceiling) have drywall finished and primed.

Shower has cement backer board installed


Joints and screws sealed with alkali resistant joint tape (quite different from drywall tape) and mortar, then fiberglass tape and waterproofing applied

First coat of water proof membrane applied to entire wall

Second coat of water proofing applied (it's the same product as above, just in a different color because it was bought at a different store).  We'll need one more coat on walls, and two more coats for the floor/wall seam.