Started to work on 1st floor bathroom by replacing toilet, retiling tub surround and removing old floor tile. Old window was replaced and shifted left slightly so it didn't run into tub surround.
Old toilet and tile base removed:
Subscribe to:
Post Comments (Atom)
Garage, other side, part deux
We don't have a ton of pictures even though good progress was made. Short story: we finished all the termite damage replacement, simil...
-
We need to get bathroom plumbing done. But since the 2nd floor bath is directly above the 1st floor bathroom, it only makes sense to plumb b...
-
Trim: "Pure White" HGSW4006 Living Room: "Pussywillow" HGSW1494 Bathroom #2: "Icy Avalanche" HGSW1497 Kitchen...
-
So both from termites and water damage (due to lack of gutters) we need to clean up a lot of the bottom plates. First remove exterior siding...
No comments:
Post a Comment